This section contains application and site considerations that need to be taken into account when specifying dock equipment.

Throughout the planning process, future requirements should always be addressed. The need for more door openings and more storage capability should be incorporated into the layout of the new building prior to its construction to save a great deal of cost and frustration later. Planners should also consider future changes to the loading dock application when deciding on the size and capacity of the loading dock equipment.